Make:
BMW
Model:
2002 Turbo
Country:
USA
Region:
FL
City:
Miami
Zip:
33134
Body Style:
Coupe
Year:
1974
Mileage:
3000
Miles
Transmission:
Manual
Fuel:
Gasoline
Doors:
2
Color:
Silver
Engine:
2.0
Condition:
Used
This stunning car has been in my possession for seven years. You can read all about it at the bottom of this page. It comes with the rare 5 speed dog leg. It starts and runs perfectly. The car originated in Italy and then UK before being shipped to the US. The owner before me had done a through body and paint job. It wears staggered Dunlop Direzza IIs 205 and 190/50R15 on period Alpina rims. The tires have about 800 miles on them. It has covered about 3000 trouble free miles since the motor rebuild. The turbo runs strong, all gears engage solid. The car needs nothing and everything works.
It is a solid chassis with no rust on the bottom of the car as you can see in the pictures. There are four things that keep if from being perfect and are in the picturess. There are two tiny bubbles that appeared this year on the bottom of passenger door, a line showing on the back of drivers side tail, a cracked in the dash and a small crack in the air dam. I was not successful in finding a replacement dash, the other three blemishes are surface and can be fixed for under 2K. I do have the no where to be found factory original stripes for the air dam as well as driver's side.
It is fully tuned up with valves adjusted and all fresh fluids and radiator flush.
KORMAN AUTOMOTIVE RUBILD LIST:
ENGINE-REMOVE ENGINE AND REBUILD TO BMW 2002 TURBO FACTORY
SPECIFICATIONS. CLEAN OIL LINES FROM CLOGGED TUBROCHARGER AND OIL COOLER. KRINKLE FINISH VALVE COVER. REPLACE ALL RUBBER FUEL SUPPLY LINES. REBUILD OIL THERMOSTAT. EVACUATE COOLING SYSTEM AND FILL WITH 50/50 MIX. FABRICATE NLA THROTTLE BODY GASKET. INSTALL ENGINE INTO ENGINE BAY. RE TORQUE CYLINDER HEAD AFTER WARMING ENGINE. SET CO. ADJUST/REPLACE THROTTLE LINKAGE FOR PROPER OPERATION.
REBUILD TURBO, Re CLOCK TURBO SO IT WILL DRAIN CORRECTLY. FABRICATED NLA TURBO POP OFF VALVE GASKET. INSTAL CUSTOM SILICONE AIR HOSES FOR TURBO INLET AND THROTTLE BODY. INSULATE TURBO WATER SUPPLY LINES AND IGNITION
WIRES
PRESSURE TEST AND CLEAN RADIATOR
BRAKES-REBUILD FRONT BRAKE CALIPERS, REPLACE REAR WHEEL CYLINDERS (1 CUSTOMER SUPPLIED, 1 FROM KORMAN), REPLACE
FROZEN BACKING PLATE, REPLACE 544MM HARD BRAKE LINE, INSTALL HAWK FRONT BRAKE PADS, REPLACE REAR
WHEEL BEARINGS, REPLACE BOTH EMERGENCY BRAKE CABLES. INSTALL S/S BRAKE LINES. FLUSH BRAKE SYSTEM, INSTALL ATE
BRAKE FLUID AND PRESSURE TEST.
ALTERNATOR-CLEAN ALTERNATOR, TEST FOR PROPER OPERATION, REPLACE DEFECTIVE BASE MOUNT. INSTALL UPGRADED
ALTERNATOR MOUNTS
ENGINE/TRANS MOUNTS-REPLACE ENGINE AND TRANSMISSION MOUNTS WITH KORMAN HEAVY DUTY UNITS. INSTALL NEW FACTORY
ENGINE DAMPENER.
SUSPENSION-INSTALL KORMAN SWAY BARS, REAR TRAILING ARM BUSHINGS, REAR SUBFRAME MOUNTS, FRONT WHEEL HUBS WITH WHEEL STUDS, REAR DRIVE FLANGES WITH WHEEL STUDS, ADJUST STEERING BOX TO LESSEN PLAY. PAINT REAR SUBFRAME AND TRAILING ARMS ELIMINATE PLAY,
SUB FRONT SPOILER-REMOVE AND PAINT FRONT SPOILER. INSTALL CORRECT FRONT SPOILER DECALS. REINSTALL FRONT SPOILER
COR BODY-REPLACE QUARTER WAIST CHROME TRIM TRIM (CUSTOMER SUPPLIED PART WAS THE WRONG SIDE), REPLACE DRIVERS SIDE DOOR CHROME. WELD RUST HOLES IN PEDAL BOX. INSTALL PEDAL BOX INSULATION. REMOVE MSD UNIT. DETAIL ENGINE BAY. REMOVE FIREWA INSULATION, REPAIR RUST UNDER FIREWALL INSULATION AND PAINT WITH POR 15. INSTALL P/S DOOR SEAL TO FIX AIR LEAK AND INSTALL D/S DOOR SILL.
TRANSMISSION/SHIFTER-REPAIR SHORT SHIFTER LINKAGE DAMAGE FROM IMPROPER INSTALLATION. REBUILD SHIFTER SUPPORT AND LINKAGE. REMOVE TRANSMISSION AND REPLACE LEAKING SEALS AND GASKETS. AND REPLACE LEAKING TRANSMISSION SEALS
REAR STRESS BAR-CUSTOM INSTALLATION OF REAR STRESS BAR/BATTERY BOX. FABRICATE CUSTOM BATTERY HOLD DOWN. CORRECT/REPAIR BATTERY CABLES.
It is a solid chassis with no rust on the bottom of the car as you can see in the pictures. There are four things that keep if from being perfect and are in the picturess. There are two tiny bubbles that appeared this year on the bottom of passenger door, a line showing on the back of drivers side tail, a cracked in the dash and a small crack in the air dam. I was not successful in finding a replacement dash, the other three blemishes are surface and can be fixed for under 2K. I do have the no where to be found factory original stripes for the air dam as well as driver's side.
It is fully tuned up with valves adjusted and all fresh fluids and radiator flush.
KORMAN AUTOMOTIVE RUBILD LIST:
ENGINE-REMOVE ENGINE AND REBUILD TO BMW 2002 TURBO FACTORY
SPECIFICATIONS. CLEAN OIL LINES FROM CLOGGED TUBROCHARGER AND OIL COOLER. KRINKLE FINISH VALVE COVER. REPLACE ALL RUBBER FUEL SUPPLY LINES. REBUILD OIL THERMOSTAT. EVACUATE COOLING SYSTEM AND FILL WITH 50/50 MIX. FABRICATE NLA THROTTLE BODY GASKET. INSTALL ENGINE INTO ENGINE BAY. RE TORQUE CYLINDER HEAD AFTER WARMING ENGINE. SET CO. ADJUST/REPLACE THROTTLE LINKAGE FOR PROPER OPERATION.
REBUILD TURBO, Re CLOCK TURBO SO IT WILL DRAIN CORRECTLY. FABRICATED NLA TURBO POP OFF VALVE GASKET. INSTAL CUSTOM SILICONE AIR HOSES FOR TURBO INLET AND THROTTLE BODY. INSULATE TURBO WATER SUPPLY LINES AND IGNITION
WIRES
PRESSURE TEST AND CLEAN RADIATOR
BRAKES-REBUILD FRONT BRAKE CALIPERS, REPLACE REAR WHEEL CYLINDERS (1 CUSTOMER SUPPLIED, 1 FROM KORMAN), REPLACE
FROZEN BACKING PLATE, REPLACE 544MM HARD BRAKE LINE, INSTALL HAWK FRONT BRAKE PADS, REPLACE REAR
WHEEL BEARINGS, REPLACE BOTH EMERGENCY BRAKE CABLES. INSTALL S/S BRAKE LINES. FLUSH BRAKE SYSTEM, INSTALL ATE
BRAKE FLUID AND PRESSURE TEST.
ALTERNATOR-CLEAN ALTERNATOR, TEST FOR PROPER OPERATION, REPLACE DEFECTIVE BASE MOUNT. INSTALL UPGRADED
ALTERNATOR MOUNTS
ENGINE/TRANS MOUNTS-REPLACE ENGINE AND TRANSMISSION MOUNTS WITH KORMAN HEAVY DUTY UNITS. INSTALL NEW FACTORY
ENGINE DAMPENER.
SUSPENSION-INSTALL KORMAN SWAY BARS, REAR TRAILING ARM BUSHINGS, REAR SUBFRAME MOUNTS, FRONT WHEEL HUBS WITH WHEEL STUDS, REAR DRIVE FLANGES WITH WHEEL STUDS, ADJUST STEERING BOX TO LESSEN PLAY. PAINT REAR SUBFRAME AND TRAILING ARMS ELIMINATE PLAY,
SUB FRONT SPOILER-REMOVE AND PAINT FRONT SPOILER. INSTALL CORRECT FRONT SPOILER DECALS. REINSTALL FRONT SPOILER
COR BODY-REPLACE QUARTER WAIST CHROME TRIM TRIM (CUSTOMER SUPPLIED PART WAS THE WRONG SIDE), REPLACE DRIVERS SIDE DOOR CHROME. WELD RUST HOLES IN PEDAL BOX. INSTALL PEDAL BOX INSULATION. REMOVE MSD UNIT. DETAIL ENGINE BAY. REMOVE FIREWA INSULATION, REPAIR RUST UNDER FIREWALL INSULATION AND PAINT WITH POR 15. INSTALL P/S DOOR SEAL TO FIX AIR LEAK AND INSTALL D/S DOOR SILL.
TRANSMISSION/SHIFTER-REPAIR SHORT SHIFTER LINKAGE DAMAGE FROM IMPROPER INSTALLATION. REBUILD SHIFTER SUPPORT AND LINKAGE. REMOVE TRANSMISSION AND REPLACE LEAKING SEALS AND GASKETS. AND REPLACE LEAKING TRANSMISSION SEALS
REAR STRESS BAR-CUSTOM INSTALLATION OF REAR STRESS BAR/BATTERY BOX. FABRICATE CUSTOM BATTERY HOLD DOWN. CORRECT/REPAIR BATTERY CABLES.